Zeebrugge Oostelijke Strekdam

The Aspiravi nv Zeebrugge Strekdam wind farm consists of ten wind turbines situated on the eastern breakwater at the port of Zeebrugge that have been generating green electricity since 2009.

In operation:
onshore wind turbines
10
onshore wind turbines
total installed capacity
8.5 MW
total installed capacity
families / year
5,000
families / year
of carbon emissions avoided / year
8,000 tons
of carbon emissions avoided / year