Skip to content
Back to projects

Vaux-sur-Sûre E25 deuxième ligne

Aspiravi nv has applied for a permit for a new project consisting of four wind turbines alongside the E25 motorway in the municipality of Vaux-sur-Sûre.

In procedure:
onshore wind turbines
4
onshore wind turbines
total installed capacity
24.8 MW
total installed capacity
families / year
14,100
families / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case