Skip to content
Back to projects

Tongeren E313

Limburg win(d)t nv has applied for an environmental permit for a new project consisting of two wind turbines alongside the E313 motorway in the municipality of Tongeren.

In procedure:
onshore wind turbines
2
onshore wind turbines
total installed capacity
7.2 MW
total installed capacity
families / year
6,285
families / year
of carbon emissions avoided / year
10,000 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case