Skip to content
Back to projects

Tera Kora II

The Aspiravi International nv Tera Kora II wind farm is situated on the island of Curaçao and consists of five wind turbines that have been generating green electricity since 2017.

In operation:
onshore wind turbines
5
onshore wind turbines
total installed capacity
17.3 MW
total installed capacity
families / year
21,000
families / year
of carbon emissions avoided / year
33,400 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case