Skip to content
Back to projects

Sint-Lievens-Houtem E40

Aspiravi nv has applied for an environmental permit for a new project consisting of two wind turbines alongside the E40 motorway in the municipality of Sint-Lievens-Houtem.

In procedure:
onshore wind turbines
2
onshore wind turbines
total installed capacity
13.2 MW
total installed capacity
families / year
11,750
families / year
of carbon emissions avoided / year
18,750 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case