Skip to content
Back to projects

Scherpenheuvel-Zichem – Bekkevoort E314

The Aspiravi nv Scherpenheuvel-Zichem-Bekkevoort wind farm is situated alongside the E314 motorway in the municipalities of Scherpenheuvel-Zichem and Bekkevoort and consists of two wind turbines that have been generating green electricity since 2018.

In operation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
6.8 MW
total installed capacity
families / year
4,800
families / year
of carbon emissions avoided / year
8,100 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case