Sainte Ode

The Aspiravi nv Sainte-Ode wind farm is situated near National Route N4 in the municipality of Sainte-Ode and consists of five wind turbines that will start generating green electricity in 2024.

In operation:
onshore wind turbines
5
onshore wind turbines
total installed capacity
18 MW
total installed capacity
families / year
14,400
families / year
of carbon emissions avoided / year
24,100 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case