Skip to content

The Aspiravi nv Puurs A12 wind farm is situated alongside the A12 motorway in the municipality of Puurs-Sint-Amands and consists of two wind turbines that have been generating green electricity since 2006.

In operation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
4 MW
total installed capacity
families / year
1,800
families / year
of carbon emissions avoided / year
3,000 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case