The Aspiravi nv Perwez E411 II wind farm is situated near the E411 motorway in the municipality of Perwez and consists of two wind turbines that will start generating green electricity in 2024.

In operation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
7.2 MW
total installed capacity
families / year
5,400
families / year
of carbon emissions avoided / year
9,000 tons