Skip to content
Back to projects

Perwez E411

The Aspiravi nv Perwez E411 wind farm is situated alongside the E411 motorway in the municipality of Perwez and consists of three wind turbines that have been generating green electricity since 2012.

In operation:
onshore wind turbines
3
onshore wind turbines
total installed capacity
6 MW
total installed capacity
families / year
4,300
families / year
of carbon emissions avoided / year
7,300 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case