Skip to content
Back to projects

Lummen Kolenhaven

The Limburg win(d)t nv Lummen Kolenhaven wind farm is situated at Kolenhaven port in the municipality of Lummen and consists of two wind turbines that have been generating green electricity since 2015.

In operation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
4 MW
total installed capacity
families / year
2,000
families / year
of carbon emissions avoided / year
3,400 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case