Skip to content
Back to projects

Lommel Kristalpark West

The Lommel win(d)t nv Lommel Kristalpark West wind farm is situated on the Lommel Kristalpark industrial estate in the municipality of Lommel and consists of six wind turbines that have been generating green electricity since 2022.

In operation:
onshore wind turbines
6
onshore wind turbines
total installed capacity
21.6 MW
total installed capacity
families / year
14,100
families / year
of carbon emissions avoided / year
23,700 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case