Skip to content
Back to projects

Lommel Kristalpark

The Lommel win(d)t nv Lommel Kristalpark wind farm is situated on the Lommel Kristalpark industrial estate in the municipality of Lommel and consists of five wind turbines that have been generating green electricity since 2013.

In operation:
onshore wind turbines
5
onshore wind turbines
total installed capacity
10 MW
total installed capacity
families / year
6,100
families / year
of carbon emissions avoided / year
10,300 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case