Skip to content
Back to projects

Laarne E17

The Aspiravi nv Laarne E17 wind farm is situated adjacent to the services alongside the E17 motorway in the municipality of Laarne and consists of one wind turbine that has been generating green electricity since 2021.

In operation:
onshore wind turbine
1
onshore wind turbine
total installed capacity
3.5 MW
total installed capacity
families / year
2,900
families / year
of carbon emissions avoided / year
4,800 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case