Skip to content
Back to projects

Hoogstraten-Wuustwezel E19

The Aspiravi nv Hoogstraten-Wuustwezel E19 (Noorderkempen) wind farm is situated alongside the E19 motorway in the municipalities of Hoogstraten and Wuustwezel and consists of two wind turbines that have been generating green electricity since 2017.

In operation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
6.9 MW
total installed capacity
families / year
5,400
families / year
of carbon emissions avoided / year
9,000 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case