Hoogstraten E19 Oost

The Aspiravi nv Hoogstraten E19 Oost wind farm is situated alongside the E19 motorway in the municipality of Hoogstraten and consists of one wind turbine that will start generating green electricity in 2024.

In operation:
onshore wind turbine
1
onshore wind turbine
total installed capacity
4.2 MW
total installed capacity
families / year
4,600
families / year
of carbon emissions avoided / year
7,700 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case