Skip to content
Back to projects

Hoogstraten E19 Oost

The Aspiravi nv Hoogstraten E19 Oost wind farm is situated alongside the E19 motorway in the municipality of Hoogstraten and consists of one wind turbine that will start generating green electricity in 2024.

In operation:
onshore wind turbine
1
onshore wind turbine
total installed capacity
4.2 MW
total installed capacity
families / year
4,600
families / year
of carbon emissions avoided / year
7,700 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case