Skip to content
Back to projects

Ham Albertkanaal I

The Limburg win(d)t nv Ham Albertkanaal wind farm is situated alongside the Albertkanaal in the municipality of Ham and consists of two wind turbines that have been generating green electricity since 2013.

In operation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
4 MW
total installed capacity
families / year
2,200
families / year
of carbon emissions avoided / year
3,600 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case