Habay E411-E25

Aspiravi has organised an information meeting to present to the population its preliminary project for 2 wind turbines located on the territory of Habay, along the E411-E25.

In procedure:
onshore wind turbines
2
onshore wind turbines
total installed capacity
11.4 MW
total installed capacity
families / year
6,100
families / year
of carbon emissions avoided / year
9,750 tons
of carbon emissions avoided / year