Skip to content
Back to projects

Diest E314 Webbekom West

Aspiravi nv is building one wind turbine along the E314 motorway in Diest.

Under construction:
onshore wind turbine
1
onshore wind turbine
total installed capacity
4.2 MW
total installed capacity
families / year
3,800
families / year
of carbon emissions avoided / year
6,300 tons
of carbon emissions avoided / year

Related news

All news items
  • News

    Newsletter December 2024

    In the December Aspiravi Group newsletter, we inform you, among other things, about the collaboration with Harol and the completed 2024 projects.

    Published on

  • News

    Realizations Aspiravi Group 2024

    This year, the Aspiravi Group again made a major contribution to the various climate and renewable energy objectives, thanks to the realization of projects in Belgium, Curacao and Spain.

    Published on

  • News

    Update status of yards 2024

    With the realisation of seven onshore wind turbines, spread over four locations in Belgium, the Aspiravi Group is again making a major contribution to the various climate and renewable energy goals this year. The state of play on the sites at Oostkamp, Diest, Bilzen and Evergem can be followed here.

    Published on

  • News

    Aspiravi to build 7 onshore wind turbines at 4 sites in Belgium in 2024

    This year, the Aspiravi Group is once again making a major contribution to various climate and renewable energy targets. On the schedule is the realisation of 7 onshore wind turbines spread over 4 locations in Belgium.

    Published on

    Aspiravi - Oostkamp verkeerslussen

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case