Skip to content
Back to projects

Diepenbeek E313 II

The Limburg win(d)t nv Diepenbeek E313 wind farm is situated alongside the E313 motorway in the municipality of Diepenbeek and consists of one wind turbine that has been generating green electricity since 2022.

In operation:
onshore wind turbine
1
onshore wind turbine
total installed capacity
4.2 MW
total installed capacity
families / year
3,400
families / year
of carbon emissions avoided / year
5,700 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case