Brecht E19 II

The Aspiravi nv Brecht E19 wind farm is situated alongside the E19 motorway in the municipality of Brecht and consists of one wind turbines that has been generating green electricity since 2022.

In operation:
onshore wind turbine
1
onshore wind turbine
total installed capacity
3.6 MW
total installed capacity
families / year
3,300
families / year
of carbon emissions avoided / year
5,500 tons
of carbon emissions avoided / year