Skip to content
Back to projects

Beringen Albertkanaal

The Limburg win(d)t nv Beringen Albertkanaal wind farm is situated alongside the Albertkanaal in the municipality of Beringen and consists of two wind turbines that have been generating green electricity since 2012.

In operation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
4.6 MW
total installed capacity
families / year
1,200
families / year
of carbon emissions avoided / year
2,000 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case