Skip to content
Back to projects

Bekkevoort E314

The Aspiravi nv Bekkevoort E314 wind farm is situated alongside the E314 motorway in the municipality of Bekkevoort and consists of two wind turbines that have been generating green electricity since 2022.

In operation:
onshore wind turbines
2
onshore wind turbines
total installed capacity
7.2 MW
total installed capacity
families / year
5,200
families / year
of carbon emissions avoided / year
8,700 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case