Skip to content
Back to projects

Antwerpen Rechterover 2018

In 2018, the Aspiravi Group built three wind turbines on the right bank of the Port of Antwerp.

In operation:
onshore wind turbines
3
onshore wind turbines
total installed capacity
9.6 MW
total installed capacity
families / year
6,100
families / year
of carbon emissions avoided / year
10,300 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case