Skip to content
Back to projects

Antwerpen Rechterover 2018

In 2018, the Aspiravi Group built three wind turbines on the right bank of the Port of Antwerp.

In operation:
onshore wind turbines
3
onshore wind turbines
total installed capacity
9.6 MW
total installed capacity
families / year
6,100
families / year
of carbon emissions avoided / year
10,300 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case