Skip to content
Back to projects

Antwerpen Rechteroever 2010

In 2010, the Aspiravi Group built six wind turbines on the right bank of the Port of Antwerp.

In operation:
onshore wind turbines
6
onshore wind turbines
total installed capacity
12 MW
total installed capacity
families / year
8,900
families / year
of carbon emissions avoided / year
14,260 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case