Skip to content
Back to projects

Antwerpen Rechteroever 2010

In 2010, the Aspiravi Group built six wind turbines on the right bank of the Port of Antwerp.

In operation:
onshore wind turbines
6
onshore wind turbines
total installed capacity
12 MW
total installed capacity
families / year
8,900
families / year
of carbon emissions avoided / year
14,260 tons
of carbon emissions avoided / year

Case in the spotlight

Borealis

Borealis is counting on Aspiravi to obtain 100% of its electricity from renewables by 2030.

Read the Borealis case