Skip to content
Back to projects

Antwerpen Linkeroever 2018

In 2018, the Aspiravi Group built one wind turbine on the left bank of the Port of Antwerp.

In operation:
onshore wind turbine
1
onshore wind turbine
total installed capacity
3.2 MW
total installed capacity
families / year
2,300
families / year
of carbon emissions avoided / year
3,700 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case