Skip to content

The Aspiravi nv Aalst E40 wind farm is situated alongside the E40 motorway in the municipality of Aalst and consists of one wind turbine that will start generating green electricity in 2024.

In operation:
onshore wind turbine
1
onshore wind turbine
total installed capacity
3.6 MW
total installed capacity
families / year
2,500
families / year
of carbon emissions avoided / year
4,200 tons
of carbon emissions avoided / year

Case in the spotlight

Google

Both Google and Aspiravi share the same ambition in Belgium : to realise the energy transition from fossil fuels to carbon-free energy production.

Read the Google case